Configuring a batch analysis
Description
For each asset, you can create a dashboard for batch analysis. The dashboard is created automatically on the basis of the settings made by you.
Procedure
To configure batch analysis, proceed as follows:
-
Select an asset in My Plant.
-
Click "Add dashboard".
-
Select "Batch analysis".
The "Batch analysis configuration" view appears.
-
Select the default time period.
The periods defined under "Configuration" are available for selection.
-
Select the parameter that represents the batch.
This can be, for example, the batch number or a customer
-
Select the parameter that represents the material that will be produced.
If only one material is produced, this information can be omitted.
-
Select one or more parameters to be compared for individual batches.
The parameters can represent, for example, various cost factors (energy consumption, cost of raw materials) of production.
-
Click "Save".
An automatically generated dashboard is created and is continuously supplied with data.
The "Batch analysis" dashboard is displayed.