The variables
Overview
You can see the following variables in the "Configuration" window.
Variable |
Description |
---|---|
Production time |
This is the total time during which the machine is operational, while at the same time the planned production time was configured in the utilization plan. |
Planned production time |
This is the total time of the production time configured in the utilization plan. |
Shift length |
Total time of the shift |
Constant value as a % |
If you wish to enter a constant value for this KPI, select the value in this control system. Set this value to 100% if you do not wish to take into account this KPI for the OEE calculation. |
Total pieces: |
This is the total number of workpieces produced in the shift (including reject parts). This value can be accepted automatically by the machine. For a manual entry, you can see the value in the "Production quality" window. |
Target cycle time |
This is the planned time for executing a cycle of the loaded NC program. This value can be set manually for each shift in the "Production quality" window. |
Good pieces  |
This is the number of the produced good workpieces in the shift (Good Pieces = Total Pieces – Scrap Pieces) |
Target pieces |
This is the planned number of good pieces to be produced. You can see this value in window "Production quality". |