The variables

Overview

You can see the following variables in the "Configuration" window.

Variable

Description

Production time

This is the total time during which the machine is operational, while at the same time the planned production time was configured in the utilization plan.

Planned production time

This is the total time of the production time configured in the utilization plan.

Shift length

Total time of the shift

Constant value as a %

If you wish to enter a constant value for this KPI, select the value in this control system. Set this value to 100% if you do not wish to take into account this KPI for the OEE calculation.

Total pieces:

This is the total number of workpieces produced in the shift (including reject parts).

This value can be accepted automatically by the machine. For a manual entry, you can see the value in the "Production quality" window.

Target cycle time

This is the planned time for executing a cycle of the loaded NC program. 

This value can be set manually for each shift in the "Production quality" window.

Good pieces 

This is the number of the produced good workpieces in the shift (Good Pieces = Total Pieces – Scrap Pieces)

Target pieces

This is the planned number of good pieces to be produced. 

You can see this value in window "Production quality".