Defining contract information for energy media¶
You can store the following contract information for each energy medium:
- Contract valid from
- Currency
- Costs
- CO2 equivalent
We recommend defining the contract information per energy medium directly on the top-level asset. This ensures that all contract information for a new energy medium as well as all changes are transferred to the lower-level assets.
Procedure¶
To define contract information, follow these steps:
- Go to My Plant and select an asset. The tiles of automatically generated and user-defined dashboards for this asset are displayed.
- Select the energy media dashboard.

- In the dashboard view, click
. - From the drop-down menu, select "Edit energy media contract information".

The energy media list with the created contract information is displayed. -
Click the medium you want to edit.
Selecting currency
The currency is defined uniformly for all contracts in the contract definition.
-
If contract information is already available from a parent asset, it can be applied.

- You can remove the link and create your own contract information.
- You can jump to the parent asset and adapt the contract information for it.
-
There are three possibilities to define prices for a contract:
- Static price
The entered value will be used for the contract at any point in time. - Split price per day
To specify costs by the hour during the course of the day, enable the "Split costs per time of day" option.
- Connect parameter
Connect any parameter (variable or KPI) that represents the price. It is needed for configuration of time series values.
- Static price
- To insert a period, clickÂ
. - Specify the start time and cost for each period.
Result¶
The list of energy media is displayed.