Buttons and elements

The following buttons and elements are available in the tabs of the "Utilization Planning" window for editing.

Parameters/elements in the "Utilization Planning" window

The following parameters and elements are available for editing:

Parameter/element

Function

Utilization plan buttons

116750934667.png

Identifies the corresponding times as working times.

116750155531.png

Identifies the corresponding times as break times.

116750927243.png

Identifies the corresponding times as free time.

116750930955.png

Identifies the corresponding times as waiting times.

"Applied Plan" tab

116749665419.png

Clicking on the small arrow opens the drop-down list for selecting a machine.

116786742027.png

Clicking on the clock icon opens the calendar for defining the time period.

116786373643.png

Clicking on the small arrow opens the drop-down list to select the available time interval in minutes.

  • 60

  • 30

  • 15

  • 5

The utilization plan is displayed with the selected time intervals.

"Edit Plans" tab

116785793291.png

Clicking on the small arrow opens the drop-down list for selecting the shift calendar that has been created.

116785803275.png

Clicking on the small arrow opens the drop-down list for selecting the available start times.

116786107659.png

Enter the designation for a new utilization plan.

116786373643.png

Clicking on the small arrow opens the drop-down list to select the available time interval in minutes.

  • 60

  • 30

  • 15

  • 5

The utilization plan is displayed with the selected time intervals.

115501159563.png

Click the "Delete" button to delete the settings.

115496938635.png

Click the "Save" button to save the settings.

"Assignment" tab

116785793291.png

Clicking on the small arrow opens the drop-down list for selecting the available shift calendar templates.

123403659403.png

Displays the assigned time zone.

116791037195.png

Clicking on the clock icon opens the calendar for defining the start date.

115502741131.png

Click the "Assign" button to assign the utilization plan that was created to the appropriate machine.