Viewing Timeseries and Events¶
For any asset configured for a specific Digital Twin Definition, the timeseries data can be viewed in "Workbench" in the "Assets" tab.
User interface¶
The user interface of "Assets" is as shown below:
① Displays the available Digital Twin Definitions
② Displays the configured assets for the selected Digital Twin Definition
③ Configures the Assets
④ Displays the timeseries and events data
⑤ Displays the package details
⑥ Date and time picker to select the timerange
⑦ Available variables
⑧ Creates a new simulation run
⑨ Button to create a new package and monitor assets
Viewing Timeseries and Events¶
To view timeseries data and event details for a specific time range, proceed with the following steps:
- In "Product Twin", select "Workbench" from the left navigation. Click "Assets".
- Select the required Digital Twin Definition from the drop-down. The assets configured for the selected Digital Twin Definition is displayed as a list. Select the asset from the available list.
It is also possible to add or delete the the Assets. To add or delete assets for this asset type, click.
From the available list, select the assets of your choice to add or de-select the assets to delete the assets. -
Select the required date range from the date picker, and enter the time in "Add time" field. The date range can be selected either by manually selecting the dates in the "Absolute" menu, or by selecting the available date range from "Quick range". The following ranges are available:
- Last 60 minutes
- Last 24 hours
- Last 7 days
- Last 30 days
- Last 90 days
- Today
- Yesterday
- Last week
- Last month
- Last quarter
4.Select the variables from "Available Variables" section. Based on the variables selected, the data is displayed on the chart.
5.Once the data is visible in the chart, you can perform any of the following actions by using the icons available to the right of the graph:
- - Display the results as chart
- - Display the results as a table
- - Move the selected time range by dragging over the chart
- - Select a different time range by dragging over the chart
- - Apply the selected time range
- - Reset the selected events from chart
- - Reset the selected time range from chart
In addition, the events for the selected time period is also displayed below the graph. On clicking a specific event, the runs information is displayed. Also, the selected event is depicted in the graph.
Result¶
- The data is displayed for the specific asset for the required selected date range.
- The events and the event details for the selected event are displayed for the selected time range.