Monitor an Asset¶
It is now possible to create a schedule to run simulations periodically using the Timeseries data for the digital twin models by Monitoring an asset.
The following steps describe the procedure:
- In the "Product Twin" application, select "Workbench" from the left navigation and click "Assets".
- From the drop-down, select the "Digital Twin Definition". Click on the required asset configured for the selected Digital twin definition.
- Click
and click "Monitor Asset".
- Enter the "Name”.
- Select the "Asset", "Digital Twin Model" and "Study" from the drop-down.
- Select the frequency of the scheduled simulation as per your choice:
- To execute the simulation on a minute basis, select the "minutes" radio button. From the drop-down, select the Simulation duration of your choice. Select the Schedule Start Date and Schedule End Date from the date picker.
Currently, it is possible to run the simulation at a time period of either 15 or 30 minutes. - To execute the simulation on an hourly basis, select the "Hours" radio button. Select the hours from the drop-down. Select the Schedule Start Date and Schedule End Date from the date picker.
- To execute the simulation at a particular time everyday, select the "Daily" radio button. Select the Simulation Start Time from the drop-down. Select the Schedule Start Date and Schedule End Date from the date picker. After creation, this run will be displayed in the "Schedules" tab.
- To execute the simulation on a minute basis, select the "minutes" radio button. From the drop-down, select the Simulation duration of your choice. Select the Schedule Start Date and Schedule End Date from the date picker.
- Click “Simulate”.
Last update: June 15, 2023