Selecting measures¶
Prerequisites¶
You have synchronized the Project and created a smart view.
Procedure¶
- On the "Smart View" page, select a smart view and click "Open Smart View".
- In the "Measures" tab, a set of predefined measures is displayed according to the functionalities and the data sources you have selected during the project configuration. Measures are also acquired (and therefore populated) during the Project synchronization. Generic Entity type extensions are shown in the "*extension name*Fact" format.
- Select the measures you want to analyze. Depending on this choice, the attributes you can select will vary accordingly. You can select a maximum number of 200 measures. A block is issued if their number exceeds this limit.
- Click "Save Measures": the "Save operation in progress" status is shown on the smart view tile.
- Wait until the "Available" status appears on the smart view tile to proceed with any other operation on the smart view.
Focus on entities: Downtime Management - Downtime Analytics and Equipment Capacity - Capacity Analytics¶
You can select these measures in a smart view. Downtime Management and Equipment Capacity are also data source functionalities.
There is a one-to-one relationship between the Downtime Management and Downtime Analytics entities, which contain machine states, and between the Equipment Capacity and Capacity Analytics entities, which provide the calculation of theoretical production based on the speed value in a specific time span.
The Downtime Management and Equipment Capacity entities contain data collected from the data sources together with the contextualization configured in the sources, while the Downtime Analytics and Capacity Analytics entities contain in addition the contextualization provided by the Context Manager: Downtime Analytics and Capacity Analytics are added to the available measures if you enable the Context Manager during the creation of the Project.
In the Downtime Analytics and Capacity Analytics entities either states and speed are contextualized on the basis of the information retained by the Context Manager: for example, an order is attached to a specific state or speed.
Example
The duration of a "Running" state on the Equipment1 is from 8.00 AM to 10.00 AM. Within this period, two different orders are being processed by the same Equipment1: as a consequence, the corresponding record is split into two shorter intervals.
The system knows that during the time interval from 8.00 AM to 9.00 AM the order #1 is processed while from 9.00 AM to 10.00 AM the order #2 is processed: the machine state record is split into two smaller records to which each corresponding order is attached.
In the analytics entities the system attaches the information it has retained on orders (OperationExecution), operations (OperationResponse), material (MaterialDefinition) and lot (MaterialLot).
The measures related to the Equipment Capacity entity are calculated only if an equipment state (EquipmentTimeModel on MDW) exists in the same time range as the capacity sample (EquipmentCapacityValue on MDW).