Supported ISO 22400-2 standard KPI formulas¶
At the moment Opcenter Intelligence does not support all the formulas defined in the ISO 22400-2 standard.
These formulas refer to different types of elements (e.g. time elements, logistical elements, quality elements). For a more detailed description of these elements, please refer to the ISO 22400-2 standard.
ISO 22400-2 standard also defines Time Models (e.g. time model for work units, time model for production order, etc.) based on the standard time elements. If you are using Insights Hub OEE as a data source and you want to configure standard KPIs, when you map measures you must keep in mind the relationship between the time model and the standard one.
This is a list of supported ISO 22400-2 standard KPIs.
| KPI | Description |
|---|---|
| Equipment load ratio | The equipment load ratio considers the produced quantity in relation to the equipment production capacity. |
| Quality ratio | The quality ratio is the relationship between the good quantity and the produced quantity. |
| Net equipment effectiveness index | The net equipment effectiveness index combines the ratio between actual unit processing time and planned busy time, the effectiveness KPI and the quality ratio KPI into a single indicator. In the standard formula, some elements are other KPIs. |
| Finished goods ratio | The finished goods ratio is the ratio of the good quantity produced to the consumed material. |
| Availability | Availability is a ratio that shows the relation between the actual production time (APT) and the planned busy time (PBT) for a work unit. |
| Integrated goods ratio | The integrated goods ratio is the relationship of the produced quantity of integrated goods (IGQ) to the consumed material (CM). |
| Corrective maintenance ratio | The corrective maintenance ratio considers the corrective maintenance time in relation to the total maintenance expressed as the sum of corrective maintenance time and planned maintenance time. |
| Production loss ratio | The production loss ratio is the relationship of quantity lost during production to the consumed material. |
| Other loss ratio | The other loss ratio is the relationship of the quantity of loss not related to production, storage or transportation to the consumed material. |
| Storage and transportation loss ratio | The storage and transportation loss ratio is the relationship of the quantity of loss during storage and transportation to the consumed material. |
| Utilization efficiency | The utilization efficiency is the ratio between the actual production time and the actual unit busy time. |
| First pass yield | The first pass yield designates the percentage of products, which fulfill the quality requirements in the first process run without reworks (good parts). It is expressed as the ratio between good parts and inspected parts. |
| Effectiveness | Effectiveness represents the ratio between the produced quantity and the expected quantity (as the quantity that can be produced in a specified period of time). For this KPI an alternative formula is used instead of the standard formula. The alternative formula is: Produced Quantity / Expected Quantity, where Expected Quantity is the quantity that can be produced within a specific time period. For example, the Expected Quantity element can be mapped on the Equipment Capacity functionality. |
| Actual to planned scrap ratio | The actual to planned scrap ratio calculated as the scrap quantity divided by the planned scrap quantity indicated how much scrap was actually produced compared with the expected (planned) value. |
| Throughput rate | Process performance in terms of produced quantity of an order and the actual execution time of an order. |
| Allocation efficiency | The allocation efficiency is the ratio between the actual allocation time of a work unit expressed as the actual unit busy time (AUBT) and the planned time for allocating the work unit expressed as the planned unit busy time (PBT). |
| Scrap ratio | The scrap ratio is the relationship between scrap quantity and produced quantity. |
| Technical efficiency | The technical efficiency of a work unit is the relationship between the actual production time (APT) and the sum of the actual production time (APT) and the actual unit delay time which includes the delays and malfunction-caused interruptions. |
| Setup ratio | The setup ratio is the ratio of actual unit setup time to actual unit processing time. It specifies the percentage time used for setup compared to the actual time used for processing. |
| Overall equipment effectiveness index | The OEE index represents the availability of a work unit , the effectiveness of the work unit , and the quality ratio KPIs integrated in a single indicator. In the standard formula, some elements are other KPIs. |
| Rework ratio | The rework ratio is the relationship between rework quantity and produced quantity. |