Skip to content

Displaying smart view information

On this page you can check if and when the deploy or undeploy operations are in progress or have been completed. Other useful information provided in the page includes the smart view type, status, scheduling settings and data load history. Refresh the page to update the information provided.

To access this page, on the "Smart View" page open a smart view and select the "Info" tab.

Available information

The following details are provided for all smart view types:

  • "Name": The name of the selected smart view.
  • "Type": Either "Physical" or "Virtual".
  • "Status"
    • "Ready" if no operations such as deploy or undeploy are in progress for the selected smart view.
    • "Busy" if an operation (deploy or undeploy) is in progress on the smart view.
  • "Deploy Info":
    • "Deployed": the name of the environment and deploy date and time are provided.
    • "Not Deployed".

Additional information (only for physical smart views)

  • "Scheduling Info": The scheduling settings applied to the smart view when it was created. The update frequency can be every 2, 5, 10, 30 or 60 minutes. 
  • "Measures Retention Period": Informs you if a retention period was defined for the smart view or not. If the retention period was configured, the number of days is shown.

Information on data load

The following details are provided in two different tables about:

  • "Initial Load": (the first deploy executed on the smart view).
  • "Load History": (the last 10 records).

These tables are not present when:

  • The smart view type is Physical and no deploy operation has been executed yet.
  • The smart view type is Virtual.

Available information

  • "Status": Running, Completed or Failed.
  • "Load Started At": Date and time when the data load started.
  • "Load Ended At": Date and time when the data load ended. If a hyphen is displayed, the load operation has not been completed yet.
  • "Duration": The duration of the initial load or of later data load operations.
  • "Time Window From": The scheduled date and time when the data load was planned to start according to the settings configured when the smart view was created. If a hyphen is displayed, all data contained in the data warehouse between "Time Window From" and "Time Window To" is loaded.
  • "Time Window To": The scheduled date and time when the data load was planned to end according to the settings configured when the smart view was created.

Last update: October 26, 2026