Skip to content

Configuring the Environment

Opcenter Intelligence employs the Environment to implement the concrete realization of the abstract configuration of the scenario. In this step you can map all the items included in the scenario on real items that exist in a physical environment.

To access the " Environments " page, select the Solution on the "Solutions" page, open the Solution and select the " Environments " tile.

When you create the Environment, you can configure the year starting from which the "Time" table of the MDW is populated during the Environment deploy. The end of the following year is assumed as ending point and the daylight time saving table is populated as well.

This field must be configured according to the age of data in the source database. When the Environment is deployed, time is generated automatically based on the selected year. Subsequently, the future time is managed by a scheduler that each month creates the missing rows for the corresponding month of the following year (for example, in November 2025 the rows until November 2026 are generated).

This setting makes an impact on smart view entities, which are generated starting from the information contained in this MDW table.

Creating the Environment

  1. On the "Environments" page, click "Create Environment". You can only create one Environment.
  2. Insert a name and a description (optional) for the Environment.
  3. In the "Generate Time From" drop-down list, select the year starting from which the Time table in the MDW will be populated during the deploy operation. The default value is the previous year. This value can always be changed by editing the Environment.
  4. Select the Scenario with which you want to associate the Environment.
  5. Click "Save".

Editing the Environment

After you have created the Environment, follow this procedure to complete its configuration by adding the required information in the different tabs.

  1. On the "Environments" page, select the Environment and click "Edit Environment".
  2. In the "Generate Time From" drop-down list, you can change the year from which the Time table in the MDW will be populated during the deploy operation. Time in the MDW is generated for the first time during the deploy and afterwards is progressively generated by a scheduler. Note: If you need to purge the MDW, you have to deploy the Environment again after the purge or wait for the scheduler to generate the rows of the Time table for the following year.
  3. In the "Servers" tab, type the name or the IP address of the corresponding physical machine for each server contained in the solution. This is the real instance of the server(s).
  4. In the "Services" tab, type for each server the instance name of the required Microsoft Services for each item of the column "Object Name". This field can be empty in the case of a default instance, or can be the name of the SQL Server instance. This instance name is the same for databases and flows.
  5. In the "Databases" tab, for each database listed under the column "Database Name", type the real name of the physical database to be created or used during the deployment. Since you can enter any source database name in this field, make sure you do not type the name of any system database, such as TempDB, otherwise bm20 views will be created there after the deploy. Note: If the source is a third-party SQL Server database, you need to manually create a new intermediate database and insert the name of this database under the column "Database Name".
  6. In the "Properties" tab, insert the correct parameters depending on your Scenario configuration.
  7. Click "Save".

Last update: October 26, 2026