Skip to content

Introduction to Project Creation

"Project" provides the flexibility to apply the existing Trigger Rule and Analysis Package settings on the input data. Before defining the structure, calculation result path will be defined in Asset Manager. Within the project section, available trigger rule and analysis package definitions can be applied to input data of data sources. By defining the structure, it can be decided where the calculation results shall be uploaded to in the asset management. Additionally, the asset name for each inserted configuration can be adapted if needed.


Last update: January 22, 2024